project name: |
|
library |
| client name: |
|
hillside school |
| site location: |
|
marlborough, ma |
| project size: |
|
3,500 sf |
| completion: |
|
2002 |
| |
|
|
|
challenge: |
|
To adapt the existing dining hall
and kitchen into a new school library. |
| |
|
|
|
solution: |
|
All kitchen equipment was removed
and the space became the stack area. This was
the only space in the project that required
structural upgrades,
The dining hall was converted into a new reading
room housing two dozen computers and worktables.
The circulation desk was centrally located between
the stack area and the reading room for security
purposes. Based upon the master plan, the
new student yard, complete with pedestrian vehicle
drop-off was relocated opposite the new entrance of
the library. |
|
|

mouse over thumbnail below to view larger image
|